Ward schoolsLexington

Your address isn’t stored or logged.

29 schools
Colour by
Areas
Go to
Over time2024-25
Loading the map…

How full (2024-25)

  • Under 85%
  • 85–99%
  • 100–119%
  • 120–149%
  • 150% and up
Lexington
JK–6314% fullBuilt 1955122 homes permitted since 2019
Full profile

Lexington Public School

Grades JK–6431 Forestlawn Rd, Waterloolex.wrdsb.ca ↗

314%Of permanent places in use355 students · 113 places · 2024-25

In 2024-25, Lexington had 355 students for 113 permanent places, so most classes were in a 12-room portapak. The board first raised a rebuild in 2018, and it hasn't been built. 122 homes were permitted in its area between January 2019 and August 2026, and 57 more are proposed.

Share Lexington

Follow Lexington

Back to the ward overview

Nothing is scheduled for Lexington that we know of.

Follow Lexington

to hear when it comes up.

How full is it?

Share Lexington

314%355 students[1] for 113 permanent places[2]

Ward median 97%

One of 14 ward schools over 100% in 2024-25. Further over its permanent places than any other ward school.

The 113 permanent places are about five classrooms: two in the older building and three kindergarten rooms added in 2013. Most students learn in a 12-room portapak, and the board's 2020 plan says “The gymnasium structure is not permanent.”[2][5][6]

0100200300113 places today355 students2011-122024-25

Enrolment is the Ministry’s October 31 headcount; permanent places are the board’s on-the-ground capacity. Portables aren’t counted as permanent places.

Students and educators

Share Lexington: students and educators

22.7students in the average class[3]

Ward median 23 (elementary schools)

All 15 classes, including split grades, counted by the Ministry in September 2025. Kindergarten classes: 24.0 on average. Grade 1 to 3 classes with no older students: 18.1 on average.

We don't calculate students per teacher here: the school's website names no more teachers than the school has classes, so the list is incomplete.[4]

A staff page is a directory of names, not full-time equivalents: part-time teachers count as one each, and staff based at other schools aren’t listed. Not every school lists its support staff. The board doesn’t publish staffing by school.

Last rebuild or addition

Share Lexington: last rebuild or addition

1955original building[2]

Ward median: built 1974

Last addition on record: three kindergarten rooms, 2013.

  • 1955Original building
  • 1958Addition
  • 1963Addition
  • 1993Reopened after a major renovation; two portapak wings and a demountable gym added
  • 2013Three kindergarten rooms
  • 1993Done
    Closed in 1984 and reopened in 1993 after a major renovation. Two 6-classroom portapak wings and a “demountable gymnasium structure” were added then; the board's 2020 plan says “The gymnasium structure is not permanent.”[7][5][8][2]
  • 2010Raised, not built
    A 13-classroom addition to replace the portapak was approved in principle in June 2010, subject to Ministry funding. It was submitted to the Ministry in May 2012 and not funded in January 2013; by 2018 the board said it was “no longer within the priority list”.[9][6][10]
  • 2013Done
    A three-classroom addition for full-day kindergarten was built in 2013, placed so the portapak could still be replaced later.[6][17]
  • 2018Raised, not built
    The board's draft 2017-2027 plan (January 2018) recommended considering a rebuild. Every year from 2021-22 to 2024-25, staff screened the rebuild as “does not meet criteria; ineligible project”. It was not sent to the Ministry in any round from 2019 to 2024-25. The board still listed it as a potential partnership project in September 2026.[11][12][13][14][15][16]

New homes in its attendance area

Share Lexington: new homes

122homes with building permits in its area, January 2019 to August 2026, 29 of them apartments[17]

Ward median 232 (elementary school areas in Waterloo)

Another 57 homes are proposed in 1 active application[18].

There’s no Development Area here, so new homes in this boundary are assigned to this school[20].

About 13% of this area's addresses are in Kitchener, where we haven't counted permits yet.[19]

By the board’s own pupil rates, the homes permitted could be home to about 28 elementary-age children (JK to Grade 8)[21].derived

City of Waterloo permits only. Gross counts: demolitions aren’t subtracted.

Tell us what you see at Lexington

Portables, class sizes, repairs, or something this page gets wrong. Reports go to Brian and are checked before anything is published, and anything added from them is marked unverified.

Sources

  1. Ontario Ministry of Education, enrolment by school, 2024-25

    October 31 headcount. The Ministry rounds to the nearest five from 2018-19 on; earlier years in the same series (back to 2011-12) are exact counts.

  2. WRDSB 2020-2030 Long-Term Accommodation Plan

    Review Area E25 (Waterloo East (Eastbridge-Colonial Acres-Lexington)). PDF page 100: permanent capacity (on-the-ground), year built and Facility Condition Index; enrolment forecast on page 101. Adopted June 21, 2021.

  3. Ontario Ministry of Education, elementary class size, 2025-26

    One row per class, counted in September 2025. A grade group of 1 to 4 pupils is shown as “<5”, so some averages are a range.

  4. Lexington Public School website, staff list

    Read November 2, 2026. A directory of names, not full-time equivalents; part-time teachers count as one each.

  5. Lexington PS School Valuation Framework, East Kitchener-Waterloo accommodation review, 2009-10

    “Number of standard sized classrooms in the school: 2 plus 12 in PPK” (portapak). PDF page 2.

  6. WRDSB letter to the Lexington community, April 30, 2013

    Kindergarten addition under construction for September 2013. PDF page 1.

  7. Lexington PS School Valuation Framework, East Kitchener-Waterloo accommodation review, 2009-10

    “When was the school built? 1955, 1958, 1963, 1993”. PDF page 10.

  8. Staff report on the East Kitchener-Waterloo accommodation review, June 21, 2010

    Closure in 1984, reopening in 1993, portapak wings and demountable gym. PDF page 2.

  9. Staff report on the East Kitchener-Waterloo accommodation review, June 21, 2010

    Recommendation to replace the porta-pack classrooms with permanent classrooms. PDF page 1.

  10. Draft 2017-2027 Long-Term Accommodation Plan, Committee of the Whole, January 22, 2018

    Review Area E25 history. PDF page 136.

  11. Draft 2017-2027 Long-Term Accommodation Plan, Committee of the Whole, January 22, 2018

    Review Area E25 recommendation. PDF page 129.

  12. 2021-22 Capital Priorities screening, Committee of the Whole, May 10, 2021

    Screening row for the Lexington rebuild; not submitted in 2019. PDF page 31.

  13. 2022-23 Capital Priorities submission and screening, Board meeting, February 28, 2022

    Screening row for the Lexington rebuild. PDF page 21.

  14. 2023-24 Capital Priorities screening, Committee of the Whole, October 16, 2023

    Screening row for the Lexington rebuild. PDF page 18.

  15. 2024-25 Capital Priorities screening, Committee of the Whole, September 16, 2024

    Screening row for the Lexington rebuild. PDF page 52.

  16. Potential partnership opportunities, Board meeting, September 28, 2026

    Lexington rebuild still listed. PDF page 76.

  17. City of Waterloo, building permits open data

    New residential units permitted January 2019 to August 21, 2026, placed in the school's 2026-27 boundary. Gross: demolitions aren't subtracted. City of Waterloo only.

  18. EngageWR, City of Waterloo development planning projects

    Active development applications, read August 23, 2026.

  19. Region of Waterloo address register

    Every civic address in Waterloo and Wilmot, read November 2, 2026.

  20. WRDSB school boundary and location maps, 2026-27

    The board's ArcGIS boundary layers, read September 30, 2026.

  21. WRDSB and WCDSB 2021 Education Development Charges Background Study

    Pupil yields per new home by type, PDF page 62: elementary rates for the Waterloo review areas (JK to Grade 8), secondary rates for North Central.

  22. WRDSB 2020-2030 Long-Term Accommodation Plan, Figure 12

    The plan's condition bands: over 65% poor, 40 to 64% fair, under 39% excellent. PDF page 30.

  23. WRDSB, Accessibility Status by School

    Board web page, read October 25, 2026.

  24. Ontario Ministry of the Environment, Conservation and Parks, drinking water quality and enforcement data

    Lead samples taken at the school under O. Reg. 243/07, 2016-17 to 2024-25.

  25. WRDSB ventilation report

    Per-school ventilation type and standalone HEPA units; the board's chart was last updated November 28, 2024.

  26. Lexington Public School website, news posts since 2017-18

    Closures, evacuations and hold-and-secure notices the school chose to post, read to September 3, 2026; counted once per event.

  27. Ontario Ministry of Education, school information and student demographics, preliminary 2024-25

    Special education and first language not English: 2024-25, school data as of July 2026. Low-income households: from the 2021 Census. The Ministry randomly rounds these percentages.

  28. EQAO, school results, 2024-25

    Share of fully participating students at or above the provincial standard; for the literacy test, fully participating first-time-eligible students who passed. EQAO posted 2025-26 results in October 2026.

Inferred from public documents, not a current account. Spot something wrong? brian@best4schoolboard.com

Read this first

Everything on these pages is inferred from public documents: Ministry of Education data, school board reports and meeting packages, school websites, and City of Waterloo open data.

It is not a current or complete account of any school. Most figures are a year or more old, some are our own calculations from those documents, and things at the school may have changed since. Check with the school or the board before you rely on a number.

Enrolment and capacity
October 2024 headcount
Building condition
2017 to 2020 assessments
Class sizes
September 2025 count
Staff lists
School websites, read November 2, 2026
New homes
City permits issued to August 21, 2026

Found something wrong or out of date? Email brian@best4schoolboard.com and it gets fixed.